{"product_id":"s1-6hk36501025-york-10kw-208-230-3ph-heater","title":"S1-6HK36501025 York 10KW 208\/230-3ph HEATER","description":"\u003ch1\u003eS1-6HK36501025 York 10KW 208\/230-3ph HEATER\u003c\/h1\u003e\n\u003ch3\u003e\u003cstrong\u003e\u003cspan style=\"background-color: rgb(255, 255, 0);\"\u003eSpecial Order Item Average lead time is 14-19 days (estimate only). Actual times may vary.\u003c\/span\u003e\u003c\/strong\u003e\u003c\/h3\u003e\n\u003cstyle\u003e\na {\n    text-decoration: none;\n    color: #464feb;\n}\ntr th, tr td {\n    border: 1px solid #e6e6e6;\n}\ntr th {\n    background-color: #f5f5f5;\n}\n\u003c\/style\u003e\n\u003cdiv\u003e\n\u003cp\u003eThe \u003cstrong\u003eYork S1-6HK36501025 Electric Heat Kit\u003c\/strong\u003e is a \u003cstrong\u003e10 kW electric heater assembly\u003c\/strong\u003e designed for York air handlers and packaged HVAC equipment operating on \u003cstrong\u003e208\/230V three-phase power\u003c\/strong\u003e. This OEM heat strip kit provides supplemental or primary electric heat while maintaining safe, reliable system performance and manufacturer-approved compatibility.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch3\u003eCross-Reference\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eYork S1-6HK36501025\u003c\/li\u003e\n\u003cli\u003e6HK36501025\u003c\/li\u003e\n\u003cli\u003eS1-6HK36501025\u003c\/li\u003e\n\u003cli\u003eHK36501025\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003eDirect OEM\u003c\/h3\u003e\n\u003cp\u003e\u003cstrong\u003eYork S1-6HK36501025\u003c\/strong\u003e\u003c\/p\u003e\n\u003chr\u003e\n\u003ch3\u003eCompatible Brands\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eYork\u003c\/li\u003e\n\u003cli\u003eJohnson Controls\u003c\/li\u003e\n\u003cli\u003eColeman\u003c\/li\u003e\n\u003cli\u003eLuxaire\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003eApplication\u003c\/h3\u003e\n\u003cp\u003eUsed in compatible air handlers and HVAC systems to:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eProvide 10 kW electric supplemental heat\u003c\/li\u003e\n\u003cli\u003eDeliver emergency heat operation\u003c\/li\u003e\n\u003cli\u003eSupply primary electric heating where required\u003c\/li\u003e\n\u003cli\u003eSupport heat pump auxiliary heating systems\u003c\/li\u003e\n\u003cli\u003eMaintain comfort during low outdoor temperatures\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003eRelated Components\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eHeat Strip Assembly\u003c\/li\u003e\n\u003cli\u003eSequencer\u003c\/li\u003e\n\u003cli\u003eElectric Heater Relay\u003c\/li\u003e\n\u003cli\u003eCircuit Breaker Kit\u003c\/li\u003e\n\u003cli\u003eLimit Switch\u003c\/li\u003e\n\u003cli\u003eAir Handler Control Board\u003c\/li\u003e\n\u003cli\u003eTransformer\u003c\/li\u003e\n\u003cli\u003eThermostat\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003eTechnician Notes\u003c\/h3\u003e\n\u003cp\u003eThe S1-6HK36501025 is a factory-engineered 10 kW electric heat package designed for 208\/230V three-phase applications. Always verify heater kit compatibility with the air handler model number before installation. Check amperage draw, sequencer operation, and high-limit safety controls during commissioning.\u003c\/p\u003e\n\u003chr\u003e\n\u003ch3\u003eCommon Symptoms of Failure\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eNo electric heat output\u003c\/li\u003e\n\u003cli\u003eInsufficient heating capacity\u003c\/li\u003e\n\u003cli\u003eTripped breaker during heat operation\u003c\/li\u003e\n\u003cli\u003eBurned or open heating elements\u003c\/li\u003e\n\u003cli\u003eHigh-limit switch trips\u003c\/li\u003e\n\u003cli\u003eIntermittent auxiliary heat operation\u003c\/li\u003e\n\u003cli\u003eUneven discharge air temperature\u003c\/li\u003e\n\u003cli\u003eSequencer failure preventing element energization\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr\u003e\n\u003ch3\u003eInstallation Tips\u003c\/h3\u003e\n\u003col\u003e\n\u003cli\u003eDisconnect all electrical power before servicing.\u003c\/li\u003e\n\u003cli\u003eVerify equipment compatibility before installation.\u003c\/li\u003e\n\u003cli\u003eConfirm 208V or 230V three-phase power supply.\u003c\/li\u003e\n\u003cli\u003eInspect all wiring connections for tightness.\u003c\/li\u003e\n\u003cli\u003eCheck heater element resistance before energizing.\u003c\/li\u003e\n\u003cli\u003eVerify operation of sequencers and limit controls.\u003c\/li\u003e\n\u003cli\u003eMeasure amp draw and compare to specifications.\u003c\/li\u003e\n\u003cli\u003eTest emergency and auxiliary heat functions after startup.\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003chr\u003e\n\u003ch3\u003eRecommended Inspection Items\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eHeating elements\u003c\/li\u003e\n\u003cli\u003eHigh-limit switches\u003c\/li\u003e\n\u003cli\u003eSequencers\u003c\/li\u003e\n\u003cli\u003ePower wiring connections\u003c\/li\u003e\n\u003cli\u003eCircuit breakers\u003c\/li\u003e\n\u003cli\u003eContactors\u003c\/li\u003e\n\u003cli\u003eTransformer output voltage\u003c\/li\u003e\n\u003cli\u003eAirflow across heater section\u003c\/li\u003e\n\u003cli\u003eAir filter condition\u003c\/li\u003e\n\u003cli\u003eThermostat staging operation\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e","brand":"Neuco","offers":[{"title":"Default Title","offer_id":45882979876930,"sku":"S1-6HK36501025","price":403.25,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1071\/8320\/files\/Screenshot2026-11-02093704.png?v=1793637449","url":"https:\/\/hvacpartstoremarket.com\/products\/s1-6hk36501025-york-10kw-208-230-3ph-heater","provider":"HVACpartstore","version":"1.0","type":"link"}