S1-6HK16501506 York 15KW 208/230V 1PH Heat Kit with Breakers
S1-6HK16501506 York 15KW 208/230V 1PH Heat Kit with Breakers
The York S1-6HK16501506 Electric Heat Kit is a 15 kW OEM electric heater assembly with integrated circuit breakers, designed for compatible York, Coleman, and Luxaire air handlers operating on 208/230V single-phase power. This factory-authorized heat strip kit provides reliable auxiliary and emergency heating while offering built-in overcurrent protection for enhanced safety and system performance.
Cross-Reference
- York S1-6HK16501506
- S1-6HK16501506
- 6HK16501506
- HK16501506
Direct OEM
York S1-6HK16501506
Compatible Brands
- York
- Coleman
- Luxaire
- Johnson Controls
Application
Used in compatible air handlers and heat pump systems to:
- Provide 15 kW electric heating capacity
- Deliver auxiliary heat during cold weather
- Supply emergency heat operation
- Support residential and light commercial HVAC applications
- Provide supplemental heating for heat pump systems
Related Components
- Electric Heat Strip
- Circuit Breaker Assembly
- Heat Sequencer
- High-Limit Switch
- Air Handler Control Board
- Transformer
- Contactor
- Thermostat
- Blower Motor Assembly
Technician Notes
The S1-6HK16501506 is a factory-engineered 15 kW electric heater package for 208/230V single-phase applications. Integrated circuit breakers provide built-in electrical protection and simplify installation. Always verify air handler compatibility, supply voltage, and circuit capacity prior to installation. Proper airflow is essential to prevent overheating and limit switch trips.
Common Symptoms of Failure
- No auxiliary heat
- No emergency heat operation
- Repeated breaker trips
- Open heating elements
- High-limit switch activation
- Reduced heating output
- Heater fails to energize
- Burned electrical connections
- Uneven discharge air temperature
- Intermittent heating operation
Installation Tips
- Disconnect power before servicing.
- Verify heat kit compatibility with the air handler model.
- Confirm 208/230V single-phase power supply.
- Inspect all breaker and wiring connections.
- Check heating element resistance before startup.
- Verify sequencer and safety control operation.
- Measure operating amperage after installation.
- Test auxiliary and emergency heat modes.
- Confirm adequate airflow across the heating elements.
Recommended Inspection Items
- Heating elements
- Integrated circuit breakers
- Heat sequencers
- High-limit switches
- Electrical terminals
- Supply voltage
- Blower motor operation
- Air handler control board
- Thermostat staging
- Air filter and airflow condition