colemanhvacparts.com, www.darindevries.com

S1-03102951001 Single Stage Control Board

  • $ 398.70
    Unit price per 
  • Save $ 24.97
Shipping calculated at checkout.


York S1-03102951001 Control Board, Single Stage, X13

The York S1-03102951001 Control Board is a genuine OEM single-stage integrated furnace control board designed for use with compatible York, Coleman, Luxaire, and Fraser-Johnston heating systems equipped with X13 blower motor technology. This control board manages critical furnace functions including ignition sequencing, blower motor operation, safety monitoring, and heating cycle control. Manufactured to original equipment specifications, the S1-03102951001 helps ensure reliable system performance, proper communication with X13 motors, and dependable heating operation.


Cross-Reference

  • S1-03102951001
  • 03102951001
  • S103102951001
  • York S1-03102951001
  • Single Stage X13 Control Board

Direct OEM

Yes – Genuine York OEM replacement control board.


Compatible Brands

  • York
  • Coleman
  • Luxaire
  • Fraser-Johnston

For compatible single-stage furnace models utilizing X13 ECM blower motors.


Application

  • Gas furnaces
  • Single-stage heating systems
  • X13 blower motor applications
  • OEM furnace control replacement
  • Integrated ignition and blower control systems

Related Components

  • X13 blower motors
  • Flame sensors
  • Hot surface ignitors
  • Pressure switches
  • Limit switches
  • Rollout switches
  • Transformers
  • Thermostats

Technician Notes

  • Designed for single-stage furnace operation.
  • Compatible with X13 ECM blower motor applications.
  • Controls ignition sequence, blower operation, and safety monitoring.
  • Verify all model and serial number information before replacement.
  • Inspect wiring harnesses and low-voltage connections when replacing the board.
  • Transfer wiring carefully and document terminal locations before removal.

Common Symptoms of Failure

  • No heat operation
  • Blower motor will not run
  • Intermittent furnace operation
  • Ignition sequence failures
  • Diagnostic fault codes
  • Burned board components
  • Loss of thermostat communication
  • Furnace lockout conditions

Installation Tips

  1. Disconnect power before servicing.
  2. Photograph all wiring connections before removal.
  3. Verify replacement board part number.
  4. Inspect all wiring and terminals for damage.
  5. Transfer each wire to the matching terminal.
  6. Secure the control board properly in the mounting bracket.
  7. Restore power and check diagnostic indicators.
  8. Verify complete heating and blower operation.

Recommended Inspection Items

  • Flame sensor condition
  • Ignitor condition
  • Pressure switch operation
  • High-limit switches
  • Rollout switches
  • Transformer output voltage
  • Thermostat wiring
  • X13 blower motor performance
  • Wiring harness connections

We Also Recommend