98695 Reznor PILOT LP ORIFICE (Y90HC-9733)
98695 Reznor PILOT LP ORIFICE (Y90HC-9733)
The 98695 Reznor Pilot LP Orifice (Y90HC-9733) is a genuine OEM liquid propane (LP) gas pilot orifice designed to provide precise pilot gas flow for reliable ignition and stable pilot flame performance. This factory-authorized replacement part helps ensure proper thermocouple heating, dependable burner startup, and safe operation in compatible Reznor heating equipment. Replacing a worn, damaged, or restricted pilot orifice can restore proper pilot flame characteristics and improve overall heating system reliability.
Cross-Reference
- 98695
- 098695
- Reznor 98695
- Reznor 098695
- Y90HC-9733
- Pilot LP Orifice Y90HC-9733
Direct OEM
Yes
Genuine Reznor OEM replacement part.
Compatible Brands
- Reznor
- Nortek Global HVAC
- Reznor Commercial Heating Equipment
Application
Designed for LP (Liquid Propane) gas pilot burner systems in compatible Reznor heating equipment.
Commonly used in:
- Reznor Unit Heaters
- Commercial Gas Heaters
- Industrial Heating Equipment
- Shop Heaters
- Warehouse Heating Systems
- Standing Pilot Gas Appliances
Always verify equipment model and serial number compatibility before ordering.
Related Components
- Pilot Assemblies
- Thermocouples
- Pilot Tubing
- Gas Valves
- Burner Assemblies
- Spark Igniters
- Flame Sensors
- Ignition Controls
Technician Notes
- OEM replacement for Reznor part number 98695.
- Direct replacement for obsolete or superseded part number 098695.
- Designed specifically for LP gas applications.
- A restricted pilot orifice can result in poor ignition and unstable pilot flames.
- Inspect pilot tubing and pilot burner assemblies during replacement.
- Verify proper pilot flame adjustment after installation.
Common Symptoms of Failure
- Pilot will not light
- Weak pilot flame
- Pilot will not remain lit
- Delayed burner ignition
- Intermittent heating operation
- Thermocouple not heating properly
- Pilot flame instability
- Insufficient pilot gas flow
Installation Tips
- Shut off gas and electrical power before servicing.
- Verify the equipment is configured for LP gas.
- Remove the existing pilot orifice carefully.
- Inspect pilot tubing and burner ports for debris or contamination.
- Install the new 98695 pilot orifice securely.
- Leak-test all gas connections after installation.
- Verify proper pilot flame appearance and operation.
- Follow Reznor service procedures and local codes.
Recommended Inspection Items
- Pilot flame quality
- Thermocouple condition
- Pilot tubing condition
- Gas valve operation
- Burner cleanliness
- Gas supply pressure
- Ignition controls
- Venting system condition
- Heat exchanger condition