colemanhvacparts.com, www.darindevries.com

91365MC ATWOOD 2 PLUG PC BOARD (COMBO)

  • $ 157.68
    Unit price per 
  • Save $ 32.31
Shipping calculated at checkout.


91365MC ATWOOD 2 PLUG PC BOARD (COMBO)

Atwood Water Heater Control 91365 non OEM

The 91365MC Atwood 2‑Plug PC Board (Combo Board) is a replacement furnace ignition control board designed for select Atwood and Hydro Flame RV furnaces utilizing the two‑plug wiring configuration. This control board manages the furnace ignition sequence, blower operation, flame sensing, gas valve control, and safety lockout functions required for reliable furnace operation.

The combo board design consolidates multiple furnace control functions into a single assembly, helping restore proper startup, burner ignition, and heating performance when a failed circuit board prevents normal furnace operation.

The 91365MC is a popular replacement for older Hydro Flame and Atwood furnace control systems experiencing intermittent ignition, blower operation issues, or complete furnace lockout conditions.


 Cross‑Reference 

Direct Replacement

  • 91365MC — Atwood 2‑Plug PC Board (Combo Board)

Compatible Brands

  • Atwood
  • Hydro Flame
  • Dometic

Application

  • RV Furnaces
  • Hydro Flame Furnaces
  • Atwood Forced‑Air Heating Systems
  • Electronic Ignition Furnaces

Controls

  • Blower Motor Operation
  • Ignition Sequencing
  • Gas Valve Control
  • Flame Sensing Circuit
  • Safety Lockout Functions

Related Components

  • 36160 Sail Switch
  • 30722 Furnace Motor
  • 30730 Furnace Motor
  • 30758 Furnace Motor
  • 30760 Furnace Motor
  • 30778 Furnace Motor
  • Igniter Assemblies
  • Limit Switches
  • Blower Wheels

 Technician Notes

Common Symptoms of Board Failure

  • Furnace blower runs but no ignition
  • No blower operation
  • No voltage to gas valve
  • Repeated ignition attempts
  • Flame lights then shuts off
  • Furnace lockout conditions
  • Intermittent heating problems

Installation Tips

  • Disconnect 12VDC power before replacement.
  • Verify sail switch and limit switch operation before condemning the board.
  • Inspect all furnace grounds and wiring connections.
  • Transfer wiring one connector at a time.
  • Confirm proper ignition sequence after installation.

Recommended Diagnostics

  • Check for 12V power supply under load.
  • Verify sail switch closure.
  • Test limit switch continuity.
  • Inspect igniter and flame sensing circuits.
  • Check gas valve operation.

We Also Recommend