colemanhvacparts.com, www.darindevries.com

58025-12 AERCO Boiler 24 MONTH MAINT KIT WTR/FIRESDE

  • $ 2,448.17
    Unit price per 
  • Save $ 136.41
Shipping calculated at checkout.


58025-12 AERCO Boiler 24 MONTH MAINT KIT WTR/FIRESDE

Normal Stocking Item

The 58025-12 AERCO 24 Month Maintenance Kit is a genuine OEM preventative maintenance package designed for scheduled two-year service intervals on compatible AERCO commercial boilers. This comprehensive maintenance kit supports both water-side and fireside maintenance, helping restore peak operating efficiency, maintain safe combustion performance, and extend equipment service life.

Routine maintenance using factory-authorized AERCO components helps reduce unplanned downtime, improve heat transfer efficiency, maintain proper combustion characteristics, and ensure reliable boiler operation in demanding commercial applications. The 58025-12 kit is ideal for facility maintenance programs, service contractors, and planned preventative maintenance schedules.


Cross-Reference

  • 58025-12
  • 5802512
  • AERCO 58025-12
  • 24 Month Maintenance Kit
  • Water Side Maintenance Kit
  • Fireside Maintenance Kit
  • Boiler Service Kit

Direct OEM

Yes – Genuine AERCO OEM maintenance kit.


Compatible Brands

  • AERCO

Compatible with select:

  • AERCO Commercial Boilers
  • AERCO High-Efficiency Boilers
  • AERCO Condensing Boiler Systems

Always verify compatibility using the equipment model and serial number.


Application

  • Scheduled 24-month boiler maintenance
  • Water-side service intervals
  • Fireside cleaning and inspection
  • Commercial boiler preventative maintenance
  • Condensing boiler service programs
  • OEM replacement maintenance components

Related Components

  • 124929 Annual Maintenance Kit
  • 124930 BMK Annual Maintenance Kit
  • 58025-13 24 Month Maintenance Kit
  • Ignitor Injector Kits
  • Exhaust Temperature Sensors
  • Condensate Trap Assemblies
  • Condensate Neutralizer Kits
  • Water Outlet Temperature Sensors

Technician Notes

  • Genuine OEM AERCO maintenance package.
  • Designed for major scheduled maintenance intervals.
  • Supports both water-side and fireside service procedures.
  • Helps maintain combustion efficiency and optimal heat transfer.
  • Ideal for preventative maintenance programs.
  • Perform combustion analysis and operational testing after servicing.
  • Inspect heat exchanger surfaces and condensate systems during maintenance.

Common Reasons for Replacement

  • Scheduled 24-month maintenance
  • Reduced thermal efficiency
  • Preventative maintenance requirements
  • Water-side scale inspection and service
  • Fireside cleaning procedures
  • Manufacturer recommended service intervals
  • Facility maintenance compliance

Installation Tips

  1. Disconnect power and follow lockout/tagout procedures.
  2. Verify kit compatibility before beginning service.
  3. Complete both water-side and fireside inspections.
  4. Replace included maintenance components according to AERCO procedures.
  5. Inspect heat exchanger surfaces for buildup or fouling.
  6. Verify condensate drainage and vent system condition.
  7. Perform combustion testing after maintenance.
  8. Confirm proper boiler operation through a complete firing cycle.

Recommended Inspection Items

  • Heat exchanger surfaces
  • Burner assembly
  • Ignition components
  • Flame sensing system
  • Exhaust temperature sensors
  • Water outlet temperature sensors
  • Condensate trap assembly
  • Condensate neutralizer systems
  • Venting system
  • Control board diagnostics

We Also Recommend